Saugeen Shores Waste Management Environmental Assessment: Review of Potential for Landfill Optimization
Notice of Submission of Terms of Reference
As part of the planning process for the proposed expansion of the Town of Saugeen Shores’ existing landfill site, a Terms of Reference (ToR) was submitted to the Ministry of the Environment, Conservation and Parks (MECP) for review as required under the Environmental Assessment Act (EAA). If approved, the ToR will serve as a framework for the preparation and review of the Environmental Assessment (EA) for the proposed undertaking.
Project Overview
The purpose of this waste management project (or undertaking) is to address the problem of diminishing disposal capacity at the Town’s Southampton Landfill Site. The goal of the process is to have an approved landfill plan in place and constructed prior to the need, which is suitable for the Town, its residents, and the environment.
It is expected that the approved capacity at the Southampton Landfill will be exhausted in about 2030. The expansion of the landfill by approximately 725,000 cubic meters is being proposed as a long-term strategy for the management of the community’s residual waste. It is projected that this would extend the sites service life by 40- years, or to 2070. As shown on the map provided, the proposed landfill optimization project can be accommodated at the existing site without the need to acquire additional lands. The environmental management system associated with an expanded landfill footprint would include the provision for a landfill liner and a leachate collection system.
Consultation
Members of the public, agencies, Indigenous communities and other interested persons may inspect the Proposed Terms of Reference and provide comments. You may inspect the Proposed Terms of Reference on the project website (www.engage.saugeenshores.ca/SSWMP) and during normal business hours from April 4th to May 5th, 2025, at the following locations:
Municipal Office: Town of Saugeen Shores
600 Tomlinson Drive Port Elgin, ON N0H 2C0
Tel: 519-832-2008 or 1-866-832-2008
*Port Elgin Library
708 Goderich Street Port Elgin, ON N0H 2C0
Tel: 519-832-2201
*Southampton Library
215 High Street Southampton, ON N0H 2L0
Tel: 519-797-3586
*It is noted that public access computers and wireless internet access are provided at the libraries. A hard copy will be available at the Municipal Office.
Submission of Comments
Your written comments about the Terms of Reference must be received by May 5, 2025. All comments should be submitted to:
Antonia Testa, Special Project Officer
Environmental Assessment Services Section, Environmental Assessment Branch
Ontario Ministry of the Environment, Conservation and Parks
135 St. Clair Avenue West, Toronto, ON M4V 1P5
A copy of all comments will be forwarded to the proponent for their consideration.
For further information about the proposed study please contact:
GEI Consultants Canada Ltd.
Andrea Nelson, Project Manager
1260 - 2 nd Avenue East, Unit 1
Owen Sound, ON N4K 2J3
sswmp@geiconsultants.com
Tel: 519-376-1805
Town of Saugeen Shores
Colin Saunders, Project Manager, Capital Projects
600 Tomlinson Drive, Box 820 Port Elgin, ON N0H 2C0
sswmp@saugeenshores.ca
Tel: 519-832-2008 Ext.101
- This Notice was published on April 4, 2025 -
Contact Us
Town of Saugeen Shores
600 Tomlinson Drive, P.O. Box 820
Port Elgin, ON N0H 2C0
Phone 519-832-2008
Toll Free 1-866-832-2008
Fax 519-832-2140